Sr No. |
TNR No |
Detail Work description |
Issue Date |
Closing Date |
Division Name |
Detail Tender Notice |
Detail Tender Estimate |
1 |
Tender Notice No. 38/2024-25 dated 26/11/2024. |
Repair and maintenance of Service and Emergency gate of Size 1.2x1.2 mtrs-1 No each of vyagranala Project Dist :-Buldana. |
02 December 2024 |
09 December 2024 |
Gate Mfg. & Erection Division No.1, Amravati |
|
|
2 |
Tender Notice No. 38/2024-25 dated 26/11/2024. |
Repair and maintenance of Service and Emergency gate of Size 1.2x1.2 mtrs 1 No each and Fabrication and Fitting of New Sheer Metal Canopy for Emergency gate hoist 15 MT Capacity of Paldhag Project, Dist :- Buldana. |
02 December 2024 |
09 December 2024 |
Gate Mfg. & Erection Division No.1, Amravati |
|
|
3 |
Tender Notice No. 38/2024-25 dated 26/11/2024. |
Fabrication and Fitting of New Sheet Metal Canopy for for Emergency gate hoist 15 MT Capacity and making emergency gate operational using Under water diving services for inspection and necessary repair of Urawali Project, Dist :-Buldana. |
02 December 2024 |
09 December 2024 |
Gate Mfg. & Erection Division No.1, Amravati |
|
|
4 |
T-03/2564/2024 DATE -03-12-2024 |
Repair Tata Tipper MH 14 CL 1504 |
03 December 2024 |
10 December 2024 |
Mechanical Division No 2 Swarget, Pune |
|
|
5 |
T-03/2568/2024 DATE - 03/12/2024 |
Repairs Kobelco SK 140 No 0462 |
03 December 2024 |
10 December 2024 |
Mechanical Division No 2 Swarget, Pune |
|
|
6 |
|
Repairs to Hydraulic Filter, Filter Kit, Tooth Tip, Lock Pin, Washer etc of JCB JS 80-140/6346 |
25 November 2024 |
09 December 2024 |
Mechanical Division, Amravati |
|
|
7 |
|
Providing diving services for Cleaning of Emergency gate slot size 1.2 x 1.2 mtr- 4 nos at Pothara RBC and LBC Project under Executive Engineer , Wardha Irrigation Division , Wardha |
04 December 2024 |
11 December 2124 |
Mechanical Engineering & Worshop Division, Nagpur |
|
|
8 |
BO No.03 for 2024-2025 |
Design, manufacture, supply, erection, trial running, performance testing and commissioning of Vertical turbine Pumps - 2000HP & H.T.Motors - 1620KW at Wakurde LIS Part II, Tal-Shirala, Dist-Sangli |
02 December 2024 |
10 December 2024 |
Chief Gate Erection Unit No. 3, Peth Vasahat, Islampur, Sangli |
|
|
9 |
T-03/2562/2024 DATE - 03-12-2024 |
Repairs To Tata Hitachi 200/9941 |
03 December 2024 |
10 December 2024 |
Mechanical Division No 2 Swarget, Pune |
|
|
10 |
T-03/2562/2024 DATE - 03-12-2024 |
Repairs To Tata Hitachi 200/9941 |
03 December 2024 |
10 December 2024 |
Mechanical Division No 2 Swarget, Pune |
|
|
11 |
BO No.13 for 2024-2025 |
Supply Installation, Testing and Commissioning of the
Rewinding and Overhauling of Vertical shaft 3.3 kv 150 Kw ,1500 Rpm Motor (Non DSR items) are invited by the Executive Engineer, Takari Mechanical and Electrical Division, Sangli -416 415 |
02 December 2024 |
07 December 2024 |
Chief Gate Erection Unit No. 3, Peth Vasahat, Islampur, Sangli |
|
|
12 |
Tender Notice No.08 for 2024-2025 |
1) म्हैसाळ उपसा सिंचन योजना टपपा क्र.2 येथील गोलिएथ क्रेन परिचलन व
विदयुतीकरणाचे काम रु.405754/- जीएसटी वगळुन
2) सॅनी एसवाय -140 एक्सकॅव्हेटर क्र.14380531 या संयंत्राच्या दुरुस्ती काम
|
29 November 2024 |
10 December 2024 |
Chief Gate Erection Unit No. 3, Peth Vasahat, Islampur, Sangli |
|
|
13 |
2647 |
Annual Operation & general maintenance of 4 Nos forced water lubricated vertical Turbine Pump with allied equipments at Khadakpurna LIS stage-4 Tahasil Deulgaon Raja Dist Buldhana during 2024-2025 |
06 December 2024 |
13 December 2024 |
Mechanical Division, Akola |
|
|
14 |
23 |
Annual Operation & general maintenance of 6 Nos oil colled & lubricated vertical Turbine Pumps with allied equipments at Dagawadi LIS Dist Buldhana during 2024-2025 |
03 December 2024 |
13 December 2024 |
Mechanical Division, Akola |
|
|
15 |
2647 |
Annual Operation & general maintenance of 6 Nos forced water lubricated Vertical Turbine Pumps with allied equipments at Khadakpurna LIS stage-2 Tah Deulgaon Raja Dist Buldhana during 2024-2025 |
06 December 2024 |
13 December 2024 |
Mechanical Division, Akola |
|
|
16 |
2647 |
Annual Operatiion & General Maintenance of 5 Nos forced water lubricated Vertical Turbine pumps with allied equipments at Khadakpurna LIS stage-1 Tah Deulgaon Raja Dist Buldhana during 2024-25 |
06 December 2024 |
13 December 2024 |
Mechanical Division, Akola |
|
|
17 |
2640 |
Repair, refitting replacing damage parts and erection of V T Pump No.1 at Khadakpurna LIS Stage -2 Dist Buldhana during 2024-25 |
06 December 2024 |
13 December 2024 |
Mechanical Division, Akola |
|
|
18 |
2640 |
Operation of 4 Nos forced water lubricated Verticla Turbine Pumps with allied equipments at Khadakpurna stage-3 Taha Deulgaon Raja dist Buldhana during 2024-2025 |
02 December 2024 |
13 December 2024 |
Mechanical Division, Akola |
|
|
19 |
2640 |
Painting of V T pumps motors ladders platform deliverypipeHiost bridge with allied equipments and greasing and maintenance of service gate 1.2 X a.2 1 No at Dagadwadi LIS Dist Buldhana during 2024-25 |
02 December 2024 |
13 December 2024 |
Mechanical Division, Akola |
|
|
20 |
2673 |
1)Name of Work:- Cleaning of toilet,Division office,Four sub Division offices section and premises of the office of Executive Mechanical Division Akola during 2024-2025
2)Supplying services of driver to Inspection Vehicle Ford Ikon car No. MH 31 AG 9906 under Executive Engineer Mechanical Division year 2024-2025 |
04 December 2024 |
16 December 2024 |
Mechanical Division, Akola |
|
|
21 |
2696 |
Dismentling & Replacing old Damaged Electric statrter 5 HP = 4Nos & Fabrication of handle for manully operating Radial GAte Size 12 x5 M= 4 Nos for Radial Gate 20 MT Cap Hoist @ Popatkhed Project Under Akola Irrigation Division Akola |
05 December 2024 |
17 December 2024 |
Mechanical Division, Akola |
|
|
22 |
05/2024-25 |
Repairs & reconditioning Boom Cylinder assly ( LH Side ) of Tata Hitachi 120 H No. 52475 |
06 December 2024 |
13 December 2024 |
Mechanical Division, Usmanabad. |
|
|
23 |
06/2024-25 |
Repairs & reconditioning to Boom Cylinder Assembly of L&T CK 72 No. 995. |
06 December 2024 |
13 December 2024 |
Mechanical Division, Usmanabad. |
|
|
24 |
07/2024-25 |
Repairs to Track Group ( R.H. Side ) of Kobelco SK 140 No. 420 |
06 December 2024 |
13 December 2024 |
Mechanical Division, Usmanabad. |
|
|
25 |
08/2024-25 |
Repairs Hydraulic System of Tata Hitachi 120 H No. 52466 |
06 December 2024 |
13 December 2024 |
Mechanical Division, Usmanabad. |
|
|
26 |
09/2024-25 |
Supplying & Fitting Top side cabin Glass for TATA Hitachi Zx120H No 51578. |
06 December 2024 |
13 December 2024 |
Mechanical Division, Usmanabad. |
|
|
27 |
10/2024-25 |
Repair to Hydraulic Pump of Tata Hitachi zx 220 no. 305 |
06 December 2024 |
13 December 2024 |
Mechanical Division, Usmanabad. |
|
|
28 |
BO No.04 for 2024-2025 |
Annual sim card Recharge for GPS unit fitted on mechineries |
06 December 2024 |
16 December 2024 |
Mechanical Division, Satara |
|
|
29 |
02/2024-25 |
Repair to swing joint assembly of Sany 140 No. 14381161 |
06 December 2024 |
13 December 2024 |
Mechanical Division, Usmanabad. |
|
|
30 |
03/2024-25 |
Repairs to Track Chain Assly R. H. Side of Sany 140 No. 14381211 |
06 December 2024 |
13 December 2024 |
Mechanical Division, Usmanabad. |
|
|